tunnel driving meaning in Chinese
隧道掘进
隧道开凿
隧洞掘进法
Examples
- Analysis of random factors affecting on deformation of ground surface during shield - tunnel driving
盾构法隧道施工影响地表变形的随机因素分析 - Therefore , this article has carried on the following work : 1 . designed and made a movable wind erosion tunnel drove by tractor firstly in our country . the wind speed range of the tunnel is from 2 m / s to 28 m / s and the speed can be adjusted continuously
研制了我国第一座使用拖拉机为动力的移动式风蚀风洞,风洞风速为2 28m s ,且连续可调,风洞总长11m ,实验段长6m ,为无底矩形截面, 1 . 0m高、 0 . 8m宽。 - The whole project comprised the building of the dam , a 2 , 428 - yard tunnel driven through the wong nai chung gap valley and a 5 , 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road . each day the volume of water being conveyed reached 7 million gallons . the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3 , 245 sq
除水坝外,其他配套的工程包括: (一)一条长达2 , 428码、贯穿黄泥涌峡谷的隧道; (二)一条长5 , 500码的引水道,可连接水塘隧道的亚宾尼滤水池及配水库,该引水道用石及砖砌成,每天可输水700万加仑; (三)位于亚宾尼水渠东部的六个过滤池,该滤水系统面积广达3 , 245平方码,深30尺,每天可过滤570万加仑水,原水过滤后,经一条直径18寸铁水管,流入花园道与宝云道交界的配水库。